RAND > Reports & Bookstore > Papers > P-3302

HomeGo to RAND HomeReports and Book Store Book Sale: Selected publications 40% off
Share

Document Information

Is the Marble Canyon Project economically justified?

Cover Image

New benefit-cost calculations for the Marble Canyon Project, based on current arguments on its economic feasibility. The main differences between these and the ones of the Bureau of Reclamation concern the use of the same rate of return on capital for both project and alternative, and the location of the latter at one, not two load centers. Since current prices show that a nuclear alternative would cost less for generating peaking power, the project is not economically justified. Nuclear costs are developed for three cases. For each, the benefit-cost ratio is less than 1:1. The major assumptions are enumerated, and judged biased in favor of the Project.

Support RAND Research — Buy This Product!

Paperback Cover Price: $20.00

Discounted Web Price: $18.00

Pages: 34

This product is part of the RAND paper series. The paper was a product of the RAND Corporation from 1948 to 2003 that captured speeches, memorials, and derivative research, usually prepared on authors' own time and meant to be the scholarly or scientific contribution of individual authors to their professional fields. Papers were less formal than reports and did not require rigorous peer review.

The RAND Corporation is a nonprofit research organization providing objective analysis and effective solutions that address the challenges facing the public and private sectors around the world. RAND's publications do not necessarily reflect the opinions of its research clients and sponsors.

Stay Informed Subscribe to RSS Feeds Search RAND Publications View Cart